Tools required8, 10, 13mm
Socket SpannerDeadblow Hammer or White
Rubber MalletNo. 2 Pozi-drive BitHack Saw Drill/ScrewdriverLong nose pliarsGasket Shears/Snips
4.5mm Drill Bit
10mm Drill BitSealant Gun2 x 5mm Allen Keys (Vic xing kit)17mm Open Ended Spanner
- Tie Bars Spirit Level Tape MeasureAngle nderPlumb bob
Eaves to frame xings and host wall xings not supplied.
General pointsCare should be taken when handling components that are seen
by the homeowner, as surfaces may be scratched if not handled
with care. Choose a suitable area for unpacking the components
and always check them before tting. Any claims for missing or
damaged parts are only accepted in line with our standard terms
and conditions of sale.
The majority of aluminium and PVCu components contain identi cation codes, usually by inkjetting or labelling – should you need to re-order a part this should help. Sealing
Health & safetySite safety is particularly important. The installation company
shall be responsible for the safety of all of the tting team, the
customer and members of the public.
The Surveyor should have carried out a risk assessment to
reduce risk on site and this should have been discussed with you
prior to starting.
Please use safe working platforms and ladders that comply with
BS EN 131. Always use equipment in line with manufacturers
recommendations .Personal Protective Equipment –such as
goggles, mask and ear defenders – should be used when , for
example, grinding out for the ashing.
Careful consideration should be given to the safe disposal of all
packaging – Ultraframe packaging is predominantly made from
recycled materials and can be readily recycled.It is important to use the correct sealant when sealing the roof.1. For Roofs glazed with Polycarbonate (or standard sealed units) a low modulus neutral cure brand of silicone must be used2. For roofs glazed with Pilkington Activ or other true ‘self cleaning’ glass, then MS Polymer sealant such as Rotabond 2000 must be used.Sealed UnitsAll protective handling tape must be removed prior to installation. For the correct selection of sealant please see aboveThe SuperstructureCheck the Dwarf wall or Plinth for being level all round. Ensure that all frames/bifold doors which abut the host wall are vertically plumb, which will then allow perfect alignment with the Ultraframe eaves beam. Before starting to install the roof, please check the condition of the host wall and whether it’s plumb – depending upon what you nd, these conditions can seriously affect the nal
integrity of the roof.
ProductThe roof kit is supplied with a location plan, a quality control
check list for the box in which this guide arrives and ,of course,
this installation guide. The location plan is used to match
individual components to their respective position on the roof.
Our numbering convention always starts at the top left, against
the house wall as you look from outside the conservatory back at
the host wall.Technical SupportTel 0843 208 6953Fax 0843 208 6952Email
















techsupport@ultraframe.co.uk
2
阳光房效果图设计方案介... 暂无评价 1页 免费 经典LEAN型阳光房PVC安装.....【维弗阳光】【无锡阳光房】一二三楼的阳光房设计方案[经典] 以前的阳台、露台...
安装阳光房需要注意的问题_建筑/土木_工程科技_专业资料。简要介绍资料的主要... 经典LEAN型阳光房PVC安装... 8页 免费 个人所得税安装过程中需... 5页 ...
VSM案例(Lean中的经典教材)_机械/仪表_工程科技_...应用分析与探讨本节将说明如何以精实概念,应用价值...(装包 0515 )gninnacs daeL(脚检/查检观外 0015 ...
经典家装报价单模版(1)_建筑/土木_工程科技_专业...材料结构及制造工艺标准说明 1-1 拆12㎝以内墙 1...PVC排水管 水电基础布线安装计费单价 配电箱更改/...
装修中最经典的 90 条小经验 1、 防水施工宜...否则有可能装不上 28、 PVC 电线管内电线截面面积... 1) 阳台的水管一定要开槽走暗管,否则阳光照射,...
B—SNX——XXX 甲 设计说明 一、设计依据 1.中国...2 孔,并铺设至楼边或单元楼 内 ,采用 PVC 管道...(2)建筑安装工程费 预算表(表二) (3)建筑...
PVC+Inlay 普通标签 独立悬挂 纸+Inlay+背胶 普通标签 背胶连接 Inlay+防水耐 ... 超爆笑笑话 有趣及爆笑图片汇集 绝对经典搞笑照片80份文档 家装材料选购攻略...
加工安装技术手册; 5.产品标准; 6.优点、缺点; 系统窗与非系统门窗的对比:... 贴PVC “ ”型分割条做槽 口 ,待外粉刷层硬化后, 再撤去PVC “ ”型...
冷色的墙纸用在浴 室及面朝南的房间,使面朝阳光的...经典欧式;该类型墙纸一般以大马士革花纹或罗马柱造型...5. 如墙纸本身有问题,必须在安装前三卷时发现,并...
木板, (PVC 板,表面可选防静电胶皮。防静电防火板,不锈钢等)或滑轨式工装 板...精益管生产线(Lean Manufacturing),简称“精益” ,利用杜绝浪 费和无间断的作业...
热门文档