Proceedings of the IV Brazilian Conference on Neural Networks - IV Congresso Brasileiro de Redes Neurais
pp. 007-012, July 20-22, 1999 - ITA, São José dos Campos - SP - Brazil
Neural Network Based Short-Term Electric Load Forecasting
with Confidence Intervals
Luciano S. Moulin1, Alexandre P. Alves da Silva1
1Escola Federal de Engenharia de Itajubá / Instituto de Engenharia Elétrica
Av. BPS, 1303 - Itajubá, MG, 37500-000, BrasilE-mails: lsm@iee.efei.br, alex@iee.efei.br
Abstract
Through traditional statistical models, like ARMAand Multilinear Regression, confidence intervals canbe computed for the short-term electric loadforecasting, assuming that the forecast errors follow anormal probability distribution. In this paper, the 1-24steps ahead load forecasts are obtained through Multi-Layer Perceptrons trained by the back-propagationalgorithm. Three techniques for the computation ofconfidence intervals for this neural network basedshort-term load forecasting are presented: (i) ErrorOutput, (ii) Resampling and (iii) MultilinearRegression adapted to neural networks. A comparisonof the three techniques is performed throughsimulations of on-line forecasting.
Despite its success in that application, up to now theuncertainty in the NN based forecasts and theestimation of confidence intervals (CIs) have beenignored. Box & Jenkins have studied the subject of CIsin ARMA models [6, 7]. CIs can also be estimated forforecasts through Multilinear Regression [7]. However,those models are based on normality and independenceassumptions which do not always hold in practicalapplications.
One should not produce a forecast of any kindwithout an idea of its reliability. However, there aremany difficulties in computing those indices for non-linear models. The NN literature is almost devoid ofinformation on that subject [8, 9]. Confidence intervalsshould be as narrow as possible, while encompassing anumber of true values that justifies its reliability.
In Section 2, three techniques for the computationof CIs for the NN based STLF are presented; in Section3, their implementation and the NN structure aredetailed; in Sections 4 and 5, those techniques arecompared through simulations of on-line forecasting.
1. Introduction
With power systems growth and the increase in theircomplexity, many factors have become influential inthe electric power generation and consumption (loadmanagement, energy exchange, spot pricing,independent power producers, non-conventionalenergy, etc.); therefore, the forecasting process hasbecome even more complex, and more accurateforecasts are needed. The relationship between the loadand its exogenous factors is complex and non-linear,making it quite difficult to model through conventionaltechniques, such as time series and linear regressionanalysis. Besides not giving the required precision,most of the traditional techniques are not robustenough. They fail to produce accurate forecasts whenquick weather changes occur. Other problems includenoise immunity, portability and maintenance [1].
Neural Networks (NNs) have succeeded in severalpower system problems, such as: planning; control;analysis; protection; design; load forecasting; securityanalysis; and fault diagnosis. The last three ones are themost popular [2]. The NN ability in mapping complexnon-linear relationships is responsible for the growingnumber of their applications to the Short-term LoadForecasting (STLF) [3-5]. Several utilities over theworld have been applying NNs for load forecasting inan experimental or operational basis [1, 2, 4].
2. Techniques for CI estimation
Among the three presented techniques for CIestimation, only the Multilinear Regression (MR)assumes that the forecasting errors follow normalprobability distribution. The Resampling (RE) andError Output (EO) techniques do not make thatassumption.
The three methods are implemented through thesame structure of a three-layer, fully connectedPerceptron, trained by the back-propagation algorithm.
2.1. Error Output
In this technique, a NN with two outputs has beentrained with output patterns corresponding to thehourly load and to the hourly load forecast error,respectively. Thus, confidence intervals are inherent tothe forecasting process. That idea assumes that it ispossible to capture patterns possibly present in theforecasting errors, as well as in the electric load.
In the NN training, the patterns for the error outputneuron are computed at each training epoch. Each timethe input training patterns are passed to the output, the
Electric Load Forecasting Approaches As short-term power load prediction is ... Neural Network Based S... 6页 免费 Short-term Load Foreca... 暂无评价...
Short-term electric load... 13页 1财富值 Neural Network Based Sho... ...1 Introduction Short-term load forecasting represents a great savings potential...
Short-term electric load forecasting based on Kalman filtering_工学_高等教育... Neural Network Based S... 6页 免费 Application of echo st... 14页 2...
关键词?电力系统?短期负荷预测?BP?人工神经网络 www.docin.com 1III Short-Term Electric Power Load Forecasting Based on Neural Network MODEL Abstract Load ...
Electric Power Forecasti... 7页 2财富值 Neural Network Based Sho... 6...This paper is mainly concerned with short-term load forecasting. The T ...
Keywords: electric load forecasting,multiple model, neural network 0.引言电力...Short-term electric load forecasting based on Kalman filtering algorithm with ...
Probabilistic Short-term Load Forecasting with Gaussian Processes_文学研究_...J. Damborg, “Electric load forecasting using an arti?cial neural network,...
in method synthesizing double periods and chaotic components to short term ...a neural-network-based electric load forecasting system[J] . IEEE ...
ciency of electric energy with the power grid [...In terms of short-term load forecasting, micro-...In Ref. [6], BP neural network is adopted to...
Short term (hourly) load forecasting is an essential hction in electric ...In this paper, we consider a hybrid neural network based load forecasting ...